Post-Harvest Irrigation Line Shock

Choque de Líneas de Riego Post-Cosecha

GreenClean® Acid Cleaner + SaniDate® 5.0 — batch-tank line treatment, NLT

After every harvestrun per room, once the table is cleared
~24 hrs totalDay 1 8:00 AM → Day 2 8:00 AM
Batch tank + pumppoured per room — no inline injector
2 chemicals, always separatedfull water flush between the two, never combined

Harvest Day

Clear the room

Before Cleaning Day 1
  • Remove all trash from the tables.
  • Throw all empty pots in the trash trailer.

Cleaning Day 1

Task 1 · GreenClean® Acid Cleaner

8:00 AM Hold 3 hrs Label rec.: 2–3 hrs

Dose the room's batch tank with GreenClean Acid Cleaner (see ) and pump the solution through the irrigation drippers on the tables.

Hold it in the piping for 3 hours — until 11:00 AM. That sits at the top of the product label's recommended 2–3 hour dwell window for irrigation line cleaning.

Task 2 · Flush

11:00 AM

Run clean water through the drippers to flush the acid cleaner out of the lines.

Task 3 · SaniDate® 5.0

11:20 AM Hold overnight Label rec.: 4+ hrs, overnight preferred

Dose the batch tank with SaniDate 5.0 (see ) and pump it through the same drippers.

Hold it in the piping overnight — into Cleaning Day 2, about 20 hrs 40 min until the 8:00 AM flush. BioSafe's guidance calls for a minimum 4-hour dwell with overnight (12–24 hrs) preferred — this comfortably clears both.

Cleaning Day 2

Final flush & check

8:00 AM
  • Flush out the SaniDate 5.0 with clean water.
  • Check all of the drippers for proper water flow before returning the room to normal use.

Verification Checklist

0 / 10 complete

Checkboxes above reset if you reload the page — they're just for working through the list. Use Log to Sheet below to save a permanent record.

Log to Sheet